अरुणाचल प्रदेश की जलविद्युत दशक: भारत के ऊर्जा क्षेत्र को बढ़ावा
अरुणाचल प्रदेश का लक्ष्य 2035 तक 19,000 मेगावाट जलविद्युत शुरू करना, रोजगार सृजित करना है।
Photo by American Public Power Association
त्वरित संशोधन
Hydropower target: 19,000 MW by 2035
Job creation: 46,000+ opportunities
Investment: ₹1.9 lakh crore
State equity: 26% in HEPs
Kameng project: 600 MW completed
Subansiri HEP: 2,000 MW by Dec 2026
Dibang project: 2880 MW by Feb 2032
महत्वपूर्ण तिथियां
महत्वपूर्ण संख्याएं
दृश्य सामग्री
Hydropower Projects in Arunachal Pradesh
Map showing the location of key hydropower projects in Arunachal Pradesh, highlighting the state's potential for energy generation.
Loading interactive map...
Arunachal Pradesh Hydropower Initiative: Key Statistics
Key statistics related to Arunachal Pradesh's hydropower development, including investment, capacity, and job creation.
- लक्ष्य जलविद्युत क्षमता
- 19,000 MW
- निवेश
- ₹1.9 lakh crore
- रोजगार सृजन
- 46,000+
- राज्य इक्विटी
- 26%
2035 तक लक्षित कुल जलविद्युत क्षमता, भारत के नवीकरणीय ऊर्जा लक्ष्यों के लिए महत्वपूर्ण।
जलविद्युत परियोजनाओं में कुल निवेश, आर्थिक गतिविधि के पैमाने को दर्शाता है।
जलविद्युत परियोजनाओं से अपेक्षित रोजगार के अवसर, जो सामाजिक-आर्थिक विकास में योगदान करते हैं।
राज्य सरकार की इक्विटी भागीदारी, सार्वजनिक हित और राजस्व साझाकरण सुनिश्चित करना।
परीक्षा के दृष्टिकोण
GS Paper III: Infrastructure, Energy
Links to Sustainable Development Goals (SDGs)
Potential for questions on environmental impact assessment and rehabilitation policies
विस्तृत सारांश देखें
सारांश
पृष्ठभूमि
नवीनतम घटनाक्रम
अक्सर पूछे जाने वाले सवाल
1. What is the main goal of Arunachal Pradesh's hydropower initiative, and what is the target year?
Arunachal Pradesh aims to commission 19,000 MW of hydropower projects by 2035. This initiative is part of the state's vision for development and aims to harness its river potential for energy generation and economic growth.
2. How many job opportunities are expected to be created through Arunachal Pradesh's hydropower development?
The hydropower development in Arunachal Pradesh is expected to create over 46,000 job opportunities.
3. What is the total investment expected for the hydropower projects in Arunachal Pradesh?
The total investment expected for the hydropower projects in Arunachal Pradesh is ₹1.9 lakh crore.
4. What is the significance of Arunachal Pradesh's hydropower potential for India's energy sector?
Arunachal Pradesh's hydropower potential can significantly boost India's energy sector by providing a clean and renewable source of electricity, contributing to energy security, and reducing reliance on fossil fuels.
5. What is the current status of the Subansiri Lower HEP, and when is it expected to be fully commissioned?
The Subansiri Lower HEP has a capacity of 2,000 MW and is expected to be fully commissioned by December 2026.
6. What is the Dibang Multipurpose Project, and when is it slated for commissioning?
The Dibang Multipurpose Project is the largest hydropower project in India, with a capacity of 2880 MW, and is slated for commissioning by February 2032.
7. What are the potential environmental concerns associated with large-scale hydropower projects like those planned in Arunachal Pradesh?
Large-scale hydropower projects can lead to deforestation, displacement of local communities, alteration of river ecosystems, and potential geological risks. Careful environmental impact assessments and mitigation measures are crucial.
8. How does Arunachal Pradesh's equity participation in hydropower projects benefit the state?
Arunachal Pradesh holds a 26% equity in these projects, which will provide the state with a share of the revenue generated, contributing to its economic development and financial stability.
9. What recent developments have spurred the focus on hydropower in Arunachal Pradesh?
Recent developments include government initiatives to promote renewable energy, resolve inter-state water disputes, and attract investment in the hydropower sector. These efforts aim to harness the state's river potential for energy generation and economic growth.
10. Who is the key personality associated with Arunachal Pradesh's hydropower development?
Pema Khandu is a key personality associated with Arunachal Pradesh's hydropower development.
बहुविकल्पीय प्रश्न (MCQ)
1. भारत में पनबिजली परियोजनाओं के बारे में निम्नलिखित कथनों पर विचार करें: 1. भारत में पहला पनबिजली संयंत्र 1897 में पश्चिम बंगाल में शुरू किया गया था। 2. 2003 के विद्युत अधिनियम ने पनबिजली विकास में निजी क्षेत्र की भागीदारी को प्रोत्साहित किया। 3. सौर और पवन ऊर्जा की आंतरायिकता को दूर करने के लिए पंप स्टोरेज परियोजनाएं विकसित की जा रही हैं। उपरोक्त कथनों में से कौन सा/से सही है/हैं?
- A.केवल 1 और 2
- B.केवल 2 और 3
- C.केवल 1 और 3
- D.1, 2 और 3
उत्तर देखें
सही उत्तर: B
कथन 1 गलत है: भारत में पहला पनबिजली संयंत्र सिदरापोंग, दार्जिलिंग में शुरू किया गया था, जो पश्चिम बंगाल में है, लेकिन सवाल राज्य के बारे में पूछता है। कथन 2 और 3 सही हैं: 2003 के विद्युत अधिनियम ने वास्तव में क्षेत्र को उदार बनाया, और ग्रिड स्थिरता के लिए पंप स्टोरेज परियोजनाएं वास्तव में विकसित की जा रही हैं।
2. अरुणाचल प्रदेश की पनबिजली क्षमता के संदर्भ में, निम्नलिखित में से कौन सा कथन सही नहीं है?
- A.अरुणाचल प्रदेश में भारत की सबसे अधिक पनबिजली क्षमता है।
- B.दिबांग बहुउद्देशीय परियोजना भारत की सबसे बड़ी पनबिजली परियोजना है।
- C.राज्य सरकार के पास सभी पनबिजली परियोजनाओं में 51% इक्विटी है।
- D.सुबनसिरी लोअर एचईपी के दिसंबर 2026 तक पूरी तरह से चालू होने की उम्मीद है।
उत्तर देखें
सही उत्तर: C
विकल्प C सही नहीं है। राज्य सरकार के पास इन परियोजनाओं में 26% इक्विटी है, न कि 51%। अन्य कथन दी गई जानकारी के आधार पर सटीक हैं।
3. निम्नलिखित युग्मों पर विचार करें: परियोजना: नदी 1. कामेंग हाइड्रो पावर प्रोजेक्ट: कामेंग 2. सुबनसिरी लोअर एचईपी: सुबनसिरी 3. दिबांग बहुउद्देशीय परियोजना: लोहित उपरोक्त युग्मों में से कौन सा/से सही सुमेलित है/हैं?
- A.केवल 1 और 2
- B.केवल 2 और 3
- C.केवल 1 और 3
- D.1, 2 और 3
उत्तर देखें
सही उत्तर: A
युग्म 1 और 2 सही सुमेलित हैं। दिबांग बहुउद्देशीय परियोजना दिबांग नदी पर है, न कि लोहित नदी पर। लोहित ब्रह्मपुत्र की एक सहायक नदी है, लेकिन परियोजना विशेष रूप से दिबांग पर है।
